Projects supported

MENAWET

MENAWET

November 2023 - October 2025 / 2 years

The Middle East and North Africa (MENA) region is highly vulnerable to the effects of climate change, characterised by rising temperatures, water stress and extreme weather events. With just 2% of the world's renewable water resources, the region faces extreme aridity and is home to 12 of the…

In progress
Population Status Assessment of the Globally Threatened crayfish in the Lakes of Prespa, Ohrid and Rivers of the Shebenik - Jabllanice National Park, Albania.

Population Status Assessment of the Globally Threatened crayfish in the Lakes of Prespa, Ohrid and Rivers of the Shebenik - Jabllanice National Park, Albania.

October 2023 - October 2024 / 13 months

The project aims to monitor the populations of two globally threatened crayfish species, Astacus astacus and Austropotamobius torrentium, in the lakes of Prespa, Ohrid, as well as rivers flowing from the Shebenik-Jabllanice National Park to the Shkumbin River. This assessment will provide…

In progress
PROÉCO - PROtection, conservation et valorisation des ÉCOsystèmes d’eau douce et de la biodiversitè sur 4 sites Ramsar dans le gouvernorat de Nabeul, Tunisie

PROÉCO - PROtection, conservation et valorisation des ÉCOsystèmes d’eau douce et de la biodiversitè sur 4 sites Ramsar dans le gouvernorat de Nabeul, Tunisie

September 2023 - August 2024 / 1 year

The scarcity of freshwater resources in Tunisia poses a significant threat to the environment. Both fossil and renewable water resources are under pressure from a changing climate and increasing human demand. The Cap Bon region, known for intense agricultural, tourist, and industrial activities,…

In progress
Conservation of Endemic Freshwater Biodiversity in the Springs of Oum Er Rabia, Morocco

Conservation of Endemic Freshwater Biodiversity in the Springs of Oum Er Rabia, Morocco

August 2023 - October 2024 / 15 months

Enhance the conservation of endemic freshwater biodiversity species that are Critically Endangered according to the IUCN Red List especially, Onychogomphus boudoti, Corrosella pallaryi and Corrosella wakrimi. Restore at least two drinking troughs for grazing purposes and domestic use to reduce…

In progress
Restoration and Conservation of Endemic Critically Endangered Fish of the Middle and Upper Tensift Basin Key Biodiversity Zone in Morocco

Restoration and Conservation of Endemic Critically Endangered Fish of the Middle and Upper Tensift Basin Key Biodiversity Zone in Morocco

August 2023 - October 2024 / 15 months

The project proposes to intervene at the scale of the priority hydraulic basin of Tensift, at the level of three KBAs in Morocco, to restore the habitats of the endemic fish Luciobarbus magniatlantis , classified as Endangered (EN). The main partners: Hydraulic Basin Agency, Waters and Forests,…

In progress
Sustaining Water for All Through Nature-Based Solutions In Balıkdamı Wetland

Sustaining Water for All Through Nature-Based Solutions In Balıkdamı Wetland

July 2023 - July 2026 / 37 months

The Balıkdamı Wetland, located in the upper basin of the Sakarya River in Turkey, is an exceptional ecological site and a protected area under national legislation. Despite its protected status, the wetland is under considerable pressure, particularly from extensive water use for agricultural…

In progress
Towards Effective Management in the Key Biodiversity Area of Cijevna Canyon Natural Monument, Montenegro

Towards Effective Management in the Key Biodiversity Area of Cijevna Canyon Natural Monument, Montenegro

July 2023 - October 2024 / 16 months

The aim of the project will be to indentify threats on Cijevna River Basin and define measures/activities for its mitigation. Events will be organized to gather relevant stakeholders in order to improve integrated management of Cijevna river basin. Also, the preparation of the Communication…

In progress
Testing New Distance Monitoring Methods for Biodiversity Conservation in Three Key Biodiversity Areas in Bosnia and Herzegovina

Testing New Distance Monitoring Methods for Biodiversity Conservation in Three Key Biodiversity Areas in Bosnia and Herzegovina

July 2023 - October 2024 / 16 months

Undertaking the first step towards conservation of associated wetland areas Neretva River, Trebižat, and Hutovo Blato is conducting primary research in the areas. The eDNA method will kick-start a novel way of researching rich biodiversity areas, enabling larger scope of faunal research in a…

In progress
Conservation of the Albanian Water Frog

Conservation of the Albanian Water Frog

July 2023 - September 2024 / 15 months

The project comes as a follow-up action to assess the population status of the species properly and holistically in its entire areal in Albania and to upgrade the SAP prepared in the previous phase. Thus, it will aim to update the information on species distribution and threats. In addition,…

In progress
Supporting Better Management of Delta Bojana in Montenegro

Supporting Better Management of Delta Bojana in Montenegro

July 2023 - October 2024 / 16 months

Project will conduct the monitoring of infrastructure projects planned to be developed in the area of KBA Delta Bojane in order to predefine potential threats to the biodiversity of the area and minimize them. It will inform stakeholder groups on the possible negative impacts, measures that should…

In progress
Enhancing the Knowledge Base on Dabarsko and Fatničko Karstic Fields and Underground Water Systems and Reducing the Threats from Unsustainable Water Use in Bosnia and Herzegovina

Enhancing the Knowledge Base on Dabarsko and Fatničko Karstic Fields and Underground Water Systems and Reducing the Threats from Unsustainable Water Use in Bosnia and Herzegovina

July 2023 - October 2024 / 16 months

Undertake research of the biodiversity of two of the most valuable and at the same time threatened karst fields (poljes) in the Mediterranean hotspot. Implemented actions towards national and international institutions to avoid and mitigate the impacts of Upper Horizons hydropower cascade that is…

In progress
Assessing Status of Fungi Inhabiting Neretva River as an Important Step Towards Identifying Top Priority Freshwater Sites in Bosnia and Herzegovina

Assessing Status of Fungi Inhabiting Neretva River as an Important Step Towards Identifying Top Priority Freshwater Sites in Bosnia and Herzegovina

July 2023 - September 2024 / 15 months

The project implies conduction of mycological research at Hutovo Blato Nature Park and on the river banks of Neretva, Bregava, Buna and Bunica rivers as one of the most important freshwater ecosystems in Mediterranean part of Bosnia and Herzegovina. Along with the inventory, risk assessment of…

In progress
Integrated Management of Freshwater Resources in the Soliman Wetland – GIReauSOL, Tunisia

Integrated Management of Freshwater Resources in the Soliman Wetland – GIReauSOL, Tunisia

July 2023 - October 2024 / 16 months

The project aims to contribute to the management of water resources in the Soliman ZH by supporting the development of analysis tools for the identification and application of sustainable solutions. This involves the development of a platform for collecting scientific data on the area, the creation…

In progress
Science-Based Conservation of Wetlands in Two Key Biodiversity Areas in the State of Palestine

Science-Based Conservation of Wetlands in Two Key Biodiversity Areas in the State of Palestine

June 2023 - October 2024 / 17 months

Undertake an evaluation of two protected areas (Pas) within two KBAs of significance in Palestine (Jordan Valley and Northern Dead Sea Region) containing respectively marshland and spring wetlands. Expected results, including from environmental DNA analysis, are designating conservation status of…

In progress
ROLLIN’ RIVERS - People, Knowledge and Action to Enhance River Restoration in Portugal

ROLLIN’ RIVERS - People, Knowledge and Action to Enhance River Restoration in Portugal

January 2023 - December 2025 / 3 years

River ecosystems, essential for mitigating climate change, are the most biodiverse on the planet and the most heavily impacted by human activities. While Europe is committed to restoring river ecosystems and improving their connectivity, Portuguese rivers are severely threatened by 13,000 barriers…

In progress
Mediterranean REsilient inSular Ephemeral sTreams (Med-RESET)

Mediterranean REsilient inSular Ephemeral sTreams (Med-RESET)

January 2023 - June 2025 / 30 months

Arid Mediterranean islands retain a wealth of traditional water management techniques applied for centuries to wisely manage scarce water resources such as small reservoirs, wells, cisterns built in houses’ basements, etc. Among the various techniques, small stone-built weirs along the riverbeds…

In progress
Upscale Sebou Water Fund

Upscale Sebou Water Fund

July 2022 - June 2024 / 2 years

This project aims to expand the Sebou Water Fund (SWF), launched in 2019 in the Upper Sebou sub-basin, to cover the entire Sebou Basin and become an integrated governance and financing mechanism for the conservation, enhancement, and improvement of freshwater ecosystem services. It will contribute…

In progress
Still Water Revival - Restoring and conserving still water ecosystems of Mediterranean karst mountains

Still Water Revival - Restoring and conserving still water ecosystems of Mediterranean karst mountains

April 2022 - March 2025 / 3 years

The Still Water Revival project is located in the Croatian Mediterranean karstic mountains Dinara, Biokovo, Velebit and Ucka. Project focus is on the still freshwater ecosystems as biodiversity hotspots. As these ecosystems within the region are historically mostly man-made, being a water source…

In progress
Sustainable Future for the freshwater ecosystem Livanjsko polje in Bosnia and Herzegovina

Sustainable Future for the freshwater ecosystem Livanjsko polje in Bosnia and Herzegovina

April 2022 - March 2025 / 3 years

Besides influencing the process of proclamation of Livanjsko Polje, and revision on Important Bird Area (IBA) sites, EuroNatur Foundation will focus on implementation of restoration measures to improve water management, reduce succession or restore peat mines. It will support local initiatives,…

In progress
Protecting Vjosa’s Delta from unsustainable urban development: an integrated approach for the long term conservation of biodiversity values in the lower Vjosa valley.

Protecting Vjosa’s Delta from unsustainable urban development: an integrated approach for the long term conservation of biodiversity values in the lower Vjosa valley.

January 2022 - December 2024 / 3 years

The construction of an international airport is planned in the Vjosa delta, in the protected area Vjosë-Nartë. The area is internationally recognised for its nature and biodiversity, including more than 200 species of birds such as the flamingo and the pelican. The aim of the project is…

In progress